Category
PVC Skinning Semi
PVC Skining/Semi-Skining Foaming Board Production Line Application and Features: PVC skinning foaming board extrusion li
Basic Info.
Model NO. | MWK-235 |
Exhaust | Exhaust |
Automation | Automatic |
Computerized | Computerized |
Transport Package | Wood Case |
Specification | CE, ISO |
Trademark | mengkwa |
Origin | Zhejiang |
Production Capacity | 400-720kg/H |
Product Description
PVC Skining/Semi-Skining Foaming Board Production LineApplication and Features:
PVC skinning foaming board extrusion line adopts foaming technology.When compared with PVC free foaming board,PVC skining foaming board not has much more smooth surface,but aso has the more skin hardness,and the mechanics performance of the PVC skining foaming board is also much better than the PVC free foaming board.PVC skining foaming board extrusion line is composed of conical twin-screw extruder,die,vacuum calibration unit,ten-roller haul off unit and so on. PVC skinning foaming board has a very wide application range. It is used for cupboard, furniture board, advertisement board, construction decoration board, upholstery for train, car and ship.
Main Technical Parameters:
Model | Skinning foam board | Semi-skinning foaming board |
Product width (mm) | 700-1220 | 1220-1600 |
Product thickness (mm) | 5-25 | 5-18 |
Extruder model | SJP130/21 | SJSZ80/156 |
Capacity (kg/h) | 720kg/h | 400kg/h |
Main motor power (kw) | 132 | 75 |
01 WHY CHOOSE MENGKWA?1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .
2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .
02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .
03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .
04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.